Thanks to barcodes, Lumenpulse has reduced the time needed to do a physical inventory by 60%.

Lumenpulse called upon Thinkmax to implement the ScanWorkX solution to optimize their operations. The results was a significant improvement in productivity and a project delivered in advance and below budget. Not only the result of a great team effort between, but also a clear understanding of change management. 

Case Study Abstract:

Challenges 

In view of this astounding growth, Lumenpulse chose to adopt a lean management strategy. With this in mind, Lumenpulse decided to automate inventory-taking with barcodes since it was becoming more difficult to do it manually without increasing the risk of errors.

In addition, the manual inventory count was not producing the desired level of accuracy, making a year-end physical inventory necessary. This task requires all hands on deck for five consecutive days including weekends if necessary.

The impact on costs was substantial. In part because of the extra wage costs due to overtime, but also, and more importantly, because production must shut down completely during a physical inventory.

Solution

Lumenpulse mandated Thinkmax to implement an end-to-end automated data entry solution...

Download the complete Case Study to find out more

Contact Us

Thinkmax -- where all of 70+ consultants are committed 100% to Microsoft Dynamics 365.

Learn how we can transform your business.

Head Office

1 (514) 316-8959info@thinkmax.com

1111 Boulevard Dr. Frederik-Philips
Suite 500
Montréal, Québec
Canada H4M 2X6

1-855-219-1475

Central Headquarters

1 (416) 556-4014

2000 Argentia Road
Plaza 5, Suite 402
Mississauga Ontario
Canada L5N 2R7

USA Headquarters

1 (800) 948-6482

13215 Bee Cave Pkwy 
Suite 260
Austin, Texas 78738